Difference between revisions of "Telcos"
From OpenCompute
(→Draft Specs and other working Documents) |
(→Workgroup Meetings) |
||
Line 38: | Line 38: | ||
! Notes | ! Notes | ||
|- | |- | ||
− | | | + | | Telco WG Monthly Call |
− | | | + | | March 6, 2017 |
− | | | + | | 1PM Eastern |
− | | | + | | 2PM Eastern |
| 340-82-786 | | 340-82-786 | ||
− | | https://fuze.me/ | + | | https://fuze.me/34636270 |
| +1 201-479-4595 | | +1 201-479-4595 | ||
| [https://www.fuze.com/numbers Fuze International Numbers] | | [https://www.fuze.com/numbers Fuze International Numbers] | ||
− | | [http://pad.opencompute.org:9001/p/Telcos- | + | | [http://pad.opencompute.org:9001/p/Telcos-March-6-2017] |
| Just a reminder that this call will be recorded and shared in the [http://www.opencompute.org/wiki/Telcos/minutes Previous Call Minutes] link below | | Just a reminder that this call will be recorded and shared in the [http://www.opencompute.org/wiki/Telcos/minutes Previous Call Minutes] link below | ||
|} | |} | ||
::[http://www.opencompute.org/wiki/Telcos/minutes Previous Call Minutes] | ::[http://www.opencompute.org/wiki/Telcos/minutes Previous Call Minutes] | ||
+ | t | ||
==Telco Project Technical Workshops== | ==Telco Project Technical Workshops== |
Revision as of 11:36, 27 March 2017
Contents
- 1 About this Workgroup
- 2 Charter
- 3 Communication
- 4 Telco Project Technical Workshops
- 4.1 OCP Engineering Workshop - London, UK, November 2, 2016
- 4.2 OCP Engineering Workshop - University of New Hampshire, August 10, 2016
- 4.3 OCP Telco Meetup - Seoul, Korea, June 9, 2016
- 4.4 OCP Engineering Workshop - San Jose, CA June 2, 2016
- 4.5 OCP Engineering Workshop - Austin, TX May 23, 2016
- 4.6 OCP U.S. Summit - San Jose, CA Mar 9-10, 2016
- 4.7 OCP Engineering Workshop - San Antonio, TX Sep 16, 2015
- 4.8 OCP U.S. Summit - San Jose, CA Mar 9-11, 2015
- 5 Specs and Designs
- 6 Approved
- 7 Draft Specs and other working Documents
- 8 Supporting Documents that may be valuable to designers
About this Workgroup
The TELCO/COMMS community was formed to assist with the adoption of open hardware and software within the Telco ecosystem.
- Leverage the work of the network, server, rack, and storage projects. An imperative of this Telco WG is to align with these groups whenever possible.
- Recognize that there may be a unique attributes required and in such cases, the WG will define the usage and feature requirements and then work with the OCP community base and projects to fulfill these requirements.
- Provide a "single voice" to OCP Service Providers and member companies on unique needs of the Telecom's private cloud, and in doing such, the community acts as a ‘buyers coop’ for sourcing.
Project Co-Leads: Bryan Larish (Verizon), Kang Won Lee (SKT)
Incubation Committee Representative: Fred Olivera (Verizon)
Charter
Communication
Mail list
- Project communication and discussions are done through the ocp-telcos@lists.opencompute.org mailing list.
- To get on the mailing list or manage your subscription go to:
- To access the mailing list archives go to:
Workgroup Meetings
First week each month. This call is open to the public.
Subject | Date | Start Time | End Time | Meeting ID | Meeting URL | Toll Number | International Number | Agenda, Minutes | Notes |
---|---|---|---|---|---|---|---|---|---|
Telco WG Monthly Call | March 6, 2017 | 1PM Eastern | 2PM Eastern | 340-82-786 | https://fuze.me/34636270 | +1 201-479-4595 | Fuze International Numbers | [1] | Just a reminder that this call will be recorded and shared in the Previous Call Minutes link below |
t
Telco Project Technical Workshops
OCP Engineering Workshop - London, UK, November 2, 2016
OCP Engineering Workshop - University of New Hampshire, August 10, 2016
OCP Telco Meetup - Seoul, Korea, June 9, 2016
OCP Engineering Workshop - San Jose, CA June 2, 2016
OCP Engineering Workshop - Austin, TX May 23, 2016
OCP U.S. Summit - San Jose, CA Mar 9-10, 2016
OCP Engineering Workshop - San Antonio, TX Sep 16, 2015
OCP U.S. Summit - San Jose, CA Mar 9-11, 2015
Specs and Designs
Approved
Draft Specs and other working Documents
- ADLINK CG-OpenRack-19 Half-Width OpenSled Server
- AT&T OpenGPON V.1.2.1 (Final draft)
- AT&T XGS MicroOLT vOLT V.1.0 (draft)
- AT&T 4 Port XGS-PON Hardened vOLT V.1.1 (draft)
- AT&T 16 Port XGS-PON vOLT V.1.1 (draft)
- ATT 1 PORT G.Fast DPU v1.0 (draft)
- ATT 4 PORT G.Fast DPU v1.0 (draft)
- ATT 8 PORT G.Fast DPU v1.0 (draft)
- ATT 16 PORT G.Fast DPU v1.1 (draft)
- Orange 400V DC Power Feeding Architecture
- Radisys CG-OpenRack-19 (draft)